A Gurgaon-based importer recently brought in a high-value shipment of networking equipment. Everything was cleared—from DGFT documents to packaging labels—except one thing: the company didn’t have an E-Waste EPR Registration from CPCB.
What should have been a two-day clearance turned into a 10-day customs hold. The team scrambled to understand the rules, gather missing documents, and respond to queries—all while the shipment sat at port accumulating charges.
This is the kind of disruption most importers face when they underestimate or misunderstand EPR obligations. And it’s completely avoidable with the right preparation and clarity.

E-Waste EPR Authorization is not optional. Under the E-Waste (Management) Rules, importers of electrical and electronic equipment are treated as “Producers.” That means importers are responsible for ensuring the end-of-life recycling of whatever they place on the Indian market.
Manufacturers usually have predictable product ranges and long-term EPR plans. But importers deal with:
This makes compliance more dynamic and often more challenging. Getting EPR authorization early removes uncertainty and prevents operational surprises.
Category selection is one of the most misunderstood parts of EPR registration. Importers often assume that the product name alone determines the category. In reality, CPCB classifies electrical and electronic equipment based on a defined schedule of categories and codes.
EPR targets are calculated category-wise. If an importer chooses the wrong category:
Many importers fall into predictable traps:
A good approach is to prepare a master list of products you import (or plan to import), then map each to the appropriate EEE code using Schedule I. This simple step reduces 70% of registration delays.
The EPR registration process seems complex at first, but once broken down, it’s manageable. Below is the importer-focused version of the actual flow.
This is the starting point for everything.
You’ll need to create an account using your company credentials and verify it via OTP. Ensure the following match exactly across documents:
Even small inconsistencies—like a missing comma or abbreviation—can trigger queries.
This section establishes your identity as an importer.
You’ll provide:
Make sure your authorized signatory’s name and designation match exactly with the documents you upload.
This part carries the most weight. Importers must submit:
For example, if laptops have a defined average life of 5 years, you must submit 5 years of sales/import data—even if some years had zero imports.
This is how CPCB verifies that your data is genuine. Without it, the system cannot calculate EPR targets correctly.
This includes:
Many importers overlook the technical file requirement, assuming it applies only to manufacturers. But importers also need to maintain these documents for verification.
Importers must outline activities they plan to undertake to educate consumers about e-waste handling and disposal. This doesn’t need to be elaborate—it can include:
Once you submit the application:
A common importer-led best practice is to reply to queries within 24–48 hours to avoid delays.
Importers must be prepared with:
If any document contradicts another—especially address details—your application may be put on hold.
Below is the fee structure applicable to importers.
| Annual E-Waste Target (MT) | Registration Fee (₹) |
|---|---|
| < 50 MT | 2,500 |
| 50–100 MT | 7,500 |
| 100–1000 MT | 1,50,000 |
| 1000–5000 MT | 10,00,000 |
| >5000 MT | 15,00,000 |
Importers often face delays when they have frequent product changes, so a planned approach works best.
This is an area where many importers get caught off guard.
New products follow standard EPR registration. You must:
This involves additional scrutiny because used equipment has higher environmental risk. Importers may need:
Used imports are more likely to face customs queries, so ensuring full EPR compliance reduces risk significantly.
A single wrong choice can delay your registration. Some commonly observed mistakes include:
A small Delhi-based importer once selected the wrong EEE category for display equipment. Because of this, their application underwent multiple rounds of clarification and was delayed by almost three weeks. Most mistakes are avoidable with a checklist-driven approach.
The most important risks include:
There are also indirect risks—such as losing clients due to delays, cancelled orders, or disrupted supply chains.
Once you receive authorization, your compliance responsibility begins. You must file annual returns that document:
Importers who miss annual returns face the possibility of suspension or additional scrutiny during renewal.
E-Waste EPR Authorization isn’t just a regulatory requirement—it’s the backbone of a smooth import operation. When your compliance is in order:
If you’re an importer navigating these requirements for the first time or simply want to ensure error-free registration, professional guidance helps avoid costly mistakes and unnecessary delays.
Book a Consultation with Green Permits
Yes. Any importer selling electrical or electronic equipment in India must obtain CPCB EPR authorization before importing.
Most applications are cleared within 25–30 working days if documents are complete and accurate.
You’ll need GST, IEC, CIN, PAN, CA-certified import data, RoHS declarations, and basic business details.
Yes. Used EEE imports require EPR authorization and often involve stricter compliance checks.
Customs may stop or delay shipments, and CPCB can impose penalties or suspend your future import permissions.