Last year, a Pune-based appliance manufacturer nearly lost ₹2 crore in export orders. The reason? Their ISI license had expired, and renewal papers were filed two weeks too late.
It’s a common oversight — one that can freeze your BIS-marked production lines and block shipments at customs.
If your product carries the ISI mark, timely renewal is more than paperwork — it’s your gateway to uninterrupted market access.
The ISI mark, issued under BIS Scheme I, certifies that a product conforms to Indian Standards (IS codes).
Every manufacturer holding a BIS license must renew it periodically to remain compliant with the BIS (Conformity Assessment) Regulations, 2018 (as amended 2025).
Pro Tip: Renewal requests should be submitted before expiry through the BIS portal using the Renew License option under Product Certification → Scheme I.
| Step | Action | Details / Documents Required |
|---|---|---|
| 1. Log in | Go to manakonline.in → Product Certification → “Renew License” | Use same credentials as original license. |
| 2. Select Product & IS Code | Choose ISI-certified product(s) you wish to renew. | Verify standard number and variant list. |
| 3. Upload Production Data | Provide production statement certified by CA/Cost Accountant. | Required to calculate marking fee. |
| 4. Pay Renewal Fees | Licence fee + inspection fee + marking fee (depending on output). | See detailed fee table below. |
| 5. Submit Self-Declaration & Test Reports | Upload latest SIT and factory testing reports if required. | Verify equipment calibration and record of sample testing. |
| 6. Inspection / Surveillance | BIS officer visits factory or reviews past surveillance records. | Non-conformities must be closed before renewal approval. |
| 7. Digital Grant of Renewal Certificate | BIS issues e-certificate through portal within 30 working days. | Certificate contains renewed validity period and marking fee rates. |
| Fee Component | Amount (₹ INR) | Notes |
|---|---|---|
| Annual License Fee | 1,000 | Payable for each license. |
| Inspection Fee | 7,000 per man-day | Factory inspection charges. |
| Marking Fee | Variable per product (IS Code) | Updated as per latest Marking Fee Notification (June 2025). |
| Late Renewal Fee | 5,000 | Applies if submitted after validity but within 1 year. |
| Re-application Fee | As per fresh license charges | If expired more than 1 year without renewal submission. |
A renewal request is only approved if your compliance record is intact. Use this Green Permits Renewal Checklist before applying:
| Check | Requirement |
|---|---|
| Factory Surveillance Reports (Last 2 Years) | Must show no major non-conformities. |
| Testing Facilities & Calibrations | Lab equipment must match product manual’s SIT requirements. |
| Marking Fee Records | All previous years’ marking fee dues cleared. |
| CA/Cost Audit Certificate | Production quantity certified for fee calculation. |
| Authorized Signatory & Updated Profile | Any profile change (updated email, phone) requires OTP verification on portal. |
| Factory Occupational & Fire Safety | Confirm safety audit measures as per latest state SPCB guidelines. |
BIS’s 2025 guideline permits a “simplified re-apply within one year” window for expired licenses:
Even after renewal, BIS conducts:
| Parameter | Detail |
|---|---|
| Product | Domestic Electric Iron |
| Standard Number | IS 302 (Part 2/3):2019 |
| Renewal Fee | ₹1,000 (License) + ₹7,000 (Inspection) + Marking Fee (₹2 per unit approx.) |
| Renewal Validity | 3 years (based on payment) |
| Late Fee | ₹5,000 (if after expiry) |
| Renewal Documents | CA certificate, marking fee records, test reports, safety audit form |
Green Permits Consulting LLC supports manufacturers in:
Book a Consultation with Green Permits
📞 +91 78350 06182 | 📧 wecare@greenpermits.in
Let our compliance team keep your BIS license active and your production uninterrupted.
At least 30 days before expiry via Manak Online portal.
1 to 5 years depending on fees paid and inspection outcome.
Yes, within one year of expiry with ₹5,000 late fee and BIS approval.
You must apply afresh under the regular grant of license process.
CA certificate, marking fee statement, factory inspection report, and latest test results.