DGFT & EPR: Why Importers Must Align with CPCB, BIS and MoEFCC before Trading

DGFT License

Introduction — When a Shipment Stalls, So Does a Business

Picture this:
A Gurgaon-based hardware importer proudly clears a bulk order of used CPUs from Singapore. The paperwork seems complete—until Customs asks for the BIS registration number. Then comes the next blow: no active EPR ID on the CPCB portal. The shipment sits idle for 22 days, storage charges mount, and the client cancels.

Such real-life setbacks underline a new truth: in 2025, DGFT licensing and EPR obligations are interlocked. The government’s “Circular Economy” reforms mean your goods must be environmentally accountable before they’re commercially tradable.

This blog decodes the integrated framework that now governs imports of electronics, plastics, solar gear, and batteries—and how to stay ahead of it.

India’s Compliance Web — The 4 Pillars Every Importer Touches

Since Foreign Trade Policy (FTP) 2023, import compliance sits at the crossroads of trade and sustainability. Four institutions share the watchtower:

DGFT – Controls import permissions and issues licenses for Restricted items.
CPCB – Enforces Extended Producer Responsibility (EPR) through category-specific portals.
BIS – Sets safety and quality baselines through the Compulsory Registration Scheme (CRS).
MoEFCC – Frames national waste-management policies that define what “responsible trade” means.

Business relevance: An importer’s readiness is now judged not only by tax or valuation accuracy but also by its environmental footprint across these four gates.

DGFT + CPCB = Two Sides of the Same License

Earlier, you could apply for an import license first and fix environmental paperwork later. That window is gone.

How the process connects:

  • DGFT verifies your EPR registration number through CPCB’s live API.
  • No valid EPR → license auto-rejection in the DGFT portal.
  • CPCB treats importers as Producers liable for post-consumer waste recovery.

What you must prepare:

  • Active EPR certificate for each relevant product stream.
  • Annual recycling plan uploaded to CPCB before shipment.
  • HS Code mapping consistent with your EPR category.

Example:
Importing LED panels? They fall under E-waste Category 17. Without that CPCB certificate, DGFT marks your license “Incomplete Application.”

Table 1 — Cross-Agency Compliance Overview

Product Segment DGFT Policy Code BIS Requirement EPR Obligation MoEFCC Rule
IT Hardware / Mobiles Restricted (used/refurbished) CRS mandatory E-Waste Rules 2022 MoEFCC 2022 Notification
Plastic Granules / Films Free → subject to QCO QCO if listed PWM Rules 2016 + 2022 EPR MoEFCC Guidelines 2022
Batteries (Lead-acid / Li-ion) Restricted BIS Standards (1S16246 etc.) Battery Waste Mgmt Rules 2022 MoEFCC 2022
Solar Modules / Inverters Restricted QCO enforced 2023 E-Waste Rules 2022 MoEFCC 2023

Each agency now checks the next—DGFT won’t clear unless BIS + EPR match, and CPCB won’t issue EPR unless BIS data is valid.

BIS Registration — Your Quality Passport

Before any invoice or airway bill is raised, confirm your product’s CRS status.

Steps smart importers follow:

  • Search the BIS Scheme-II list for your category.
  • Arrange testing at a BIS-recognized lab.
  • Upload self-declaration and model photographs.
  • Receive BIS CRS ID—needed in shipping documents.

Why this matters:

  • Customs checks BIS label & barcode at port.
  • Non-compliant goods can be detained or re-exported.
  • BIS status is now auto-shared with DGFT licensing modules.

EPR Targets and Data Responsibility

Beyond one-time registration, importers face yearly recycling quotas.

Category EPR Target 2024-25 EPR Target 2025-26 Evidence Required
E-waste Importers 70 % collection 80 % Recycler certificates + returns
Plastic Importers 80 % recycling 100 % Transaction IDs on CPCB Portal
Battery Importers 70 % recovery 90 % Recycler Agreement proof

CPCB audits sample importers every quarter. False data can trigger suspension of your EPR ID and DGFT IEC flagging.

Table 2 — Timeline of Key Notifications (2022-2025)

Year Rule / Circular Issuing Body Business Effect
2022 E-Waste Rules 2022 MoEFCC Introduced importer EPR definition
2022 Battery Waste Mgmt Rules MoEFCC Applied EPR to battery imports
2023 FTP 2023 DGFT Linked licensing with sustainability
2024 Notification 13/2024-25 DGFT/BIS Prohibited unregistered electronics
2025 Barcode / QR Integration Roll-out CPCB Mandatory digital tracking of imports

The Cost of Ignoring EPR Compliance

Some importers still gamble on delayed registration. The penalties can erase profit margins overnight.

Real-world impact:

  • Demurrage: average ₹2–3 lakh per container per week.
  • Penalty: up to ₹10 lakh under Environment Protection Act.
  • Blacklist risk: DGFT can suspend your IEC for repeated default.
  • Loss of client trust: OEMs and MNC buyers now demand proof of EPR before purchase orders.

Building a Single Compliance Pipeline

Instead of reacting to circulars, progressive importers design a unified workflow.

Recommended approach:

  • Start EPR registration 60 days before DGFT application.
  • Parallelly initiate BIS testing and label printing.
  • Maintain a shared compliance folder—EPR certificate, BIS ID, IEC copy.
  • Engage authorized recyclers in advance to lock annual targets.
  • Schedule internal compliance audits every quarter.

Outcome: zero-delay clearance, predictable costs, and stronger sustainability positioning during ESG audits.

Sustainability Dividend — Beyond Regulation

Aligning with CPCB and MoEFCC isn’t only about avoiding penalties; it’s a brand asset.

  • Importers with verified EPR IDs qualify for Green Procurement tenders.
  • Banks increasingly seek compliance proof for ESG-linked loans.
  • Brands can claim carbon-offset credits for verified recycling.

By 2030, over 40 % of India’s trade policy incentives will link to circular-economy benchmarks—today’s compliance builds tomorrow’s advantage.

How Green Permits Makes It Seamless

Green Permits acts as your in-house compliance partner:

  • EPR Authorization — application, annual return filing, target tracking.
  • BIS Certification — testing support, QCO mapping, documentation.
  • Recycling Plant Setup — advisory for EPR-linked capacity building.

Clients have reported up to 40 % faster DGFT approvals and complete elimination of customs delays after end-to-end alignment through our team.

🔗 EPR Authorization
🔗 BIS Certification
🔗 Recycling Plant Setup

Conclusion — Compliance is Now a Growth Strategy

Trade and environment are no longer parallel lanes—they merge at the import gate.

Early alignment with DGFT, CPCB, BIS and MoEFCC safeguards your shipments, accelerates licenses, and proves your commitment to responsible growth.

Act today — avoid tomorrow’s bottlenecks.

📞 +91 78350 06182
📧 wecare@greenpermits.in
Book a Consultation with Green Permits

 

Book a Technical Call with Expert

FAQs

Yes. Importers of used or refurbished electronics must hold EPR authorization before DGFT clearance.

Check the latest BIS CRS list and Quality Control Orders (QCOs) on the BIS portal.

Yes—plastic wrapping or packaging used for imports falls under PWM EPR Rules 2022.

You can engage authorized recyclers to fulfil targets, but liability remains with you as the Importer-Producer.

Typically 30–45 days after submission of complete documents on CPCB portal.

Leave A Comment

Your email address will not be published. Required fields are marked *