The Reality of Vehicle Scrapping Plant Setup in India After 01 April 2025
In 2025, the regulatory environment for vehicle recycling changed fundamentally. Several manufacturers failed to declare their EPR obligations before 30 April 2025 , and many newly established scrapping facilities faced delays in generating EPR certificates because their CPCB portal registrations were incomplete.
From 01 April 2025 , vehicle scrapping operations are governed under the Environment Protection (End-of-Life Vehicles) Rules, 2025 , in addition to the Motor Vehicles (Registration and Functions of Vehicle Scrapping Facility) Rules, 2021.
This means a Vehicle Scrapping Plant Setup in India is no longer just a dismantling yard project. It is:
A regulated environmental activity
A data-driven steel recovery system
A portal-based compliance model
A certificate-linked revenue mechanism
If compliance is not structured properly, investment of ₹20–35 crore can remain blocked for months.
Legal Framework Governing Vehicle Scrapping Plant Setup in India
Environment Protection (End-of-Life Vehicles) Rules, 2025
The ELV Rules, 2025, effective from 01 April 2025, introduced a national EPR framework for End-of-Life Vehicles.
Under these rules:
Every Producer must register on a centralized CPCB portal.
Producers must declare EPR obligation for the current financial year by 30 April .
Annual return for the previous financial year must be filed by 30 June .
EPR obligations must be fulfilled through purchase of EPR certificates from registered RVSFs.
Non-compliance attracts action under Section 15 of the Environment Protection Act, 1986 .
This connects scrapping plants directly with national compliance targets.
Key Numerical Compliance Points
EPR targets start at 8% steel recovery (FY 2025–26).
Targets increase to 13% and later 18% .
Reporting cycle is annual and financial-year based.
Portal-based declaration is mandatory.
Data must include vehicle category, weight of steel used, and steel recovered.
For a 10,000-vehicle annual processing facility, even a 2% documentation gap can translate into certificate revenue loss of ₹50–80 lakh annually.
EPR Targets That Define the Business Model
Transport Vehicles
Financial Year
Minimum Steel Recovery Target
2025–26 to 2029–30
8%
2030–31 to 2034–35
13%
2035–36 onwards
18%
Non-Transport Vehicles
Financial Year
Minimum Steel Recovery Target
2025–26 to 2029–30
8%
2030–31 to 2034–35
13%
2035–36 onwards
18%
Why Steel Recovery Matters
A typical passenger vehicle contains:
65–70% steel
7–8% aluminum
10–15% plastics
3–5% rubber
Remaining glass and fluids
If your RVSF processes 12,000 vehicles per year , and average steel per vehicle is 800 kg , total potential steel recovery is approximately:
12,000 × 0.8 MT = 9,600 MT per year
Proper documentation of this recovery directly impacts certificate generation.
Without calibrated weighing systems and material tracking, certificate rejection becomes likely.
Regulatory Overview for Vehicle Scrapping Plant Setup in India
Regulation
Key Requirement
Deadline
Applicable To
Risk if Ignored
ELV Rules 2025
Mandatory EPR integration
Effective 01 April 2025
Producers & RVSFs
Suspension
EPR Obligation Declaration
Financial year declaration
30 April
Producers
Compliance notice
Annual Return Filing
Previous FY reporting
30 June
Producers & Bulk Consumers
Penalty
Section 15, EPA 1986
Environmental liability
Continuous
All stakeholders
Fine + imprisonment
Interpretation
If a scrapping plant is operational but not registered on the CPCB portal:
EPR certificates cannot be generated.
Producers cannot purchase compliance credits.
Revenue channel remains blocked.
Legal exposure increases.
Detailed Registration Process for RVSF
Step 1 — Portal Registration
The CPCB ELV portal requires:
GST details
PAN
CIN (if applicable)
IEC (if importing vehicles)
Authorized person information
Login credentials are generated digitally.
Step 2 — Document Upload
You must upload:
GST certificate
PAN (company)
PAN (authorized person)
Incorporation documents
Land ownership/lease proof
Step 3 — Facility Declaration
The portal requires structured technical data:
Installed dismantling capacity (MT/year)
Steel recovery estimation
Pollution control systems installed
Hazardous waste handling mechanism
Depollution infrastructure
Step 4 — Fee Payment and Scrutiny
Registration fee payable online
Processing time approximately 30 working days
Query window often 7–15 days
Delayed response leads to rejection.
Infrastructure Requirements in Depth
A compliant Vehicle Scrapping Plant Setup in India requires scientific layout planning.
Land Requirement
Minimum 2 acres (small unit)
Recommended 3–5 acres (commercial scale)
Separate zones for:
Depollution
Dismantling
Storage
Hazardous waste
Vehicle parking
Mandatory Systems
Impervious concrete flooring
Oil and coolant drainage pits
Fluid removal system
Battery removal station
Fire suppression system
CCTV monitoring
Weighbridge for material tracking
Environmental Systems
Hazardous waste storage shed
Waste oil storage tanks
Wastewater collection
Stormwater separation
Air pollution control (if shredding installed)
If shredding machinery is installed:
Capital cost increases by ₹6–12 crore
Power requirement increases by 400–800 kW
Dust control system mandatory
Financial Planning with Realistic Numbers
Component
Estimated Investment (₹ Crore)
Land (3–5 acres)
5–10
Civil & flooring
3–6
Depollution & dismantling line
8–15
Shredder (optional)
6–12
Pollution control & utilities
3–5
Working capital
3–6
Total Range
18–35 Crore
Operating Revenue Streams
Scrap steel resale
Aluminum resale
Reusable parts resale
EPR certificate trading
For a 10,000 vehicle capacity plant:
Scrap steel revenue can range ₹25–40 crore annually (depending on LME rates).
Certificate revenue can add 8–15% additional margin.
Compliance Risks That Commonly Cause Delays
Incorrect steel weight reporting
No calibrated weighbridge
Improper hazardous oil storage
Incomplete portal documentation
Missing annual filing
Failure to declare EPR obligation by 30 April
Under Section 15 of EPA, penalties may include:
Monetary fines
Environmental compensation
Prosecution
Operational suspension
Even a 60-day suspension can impact cash flow by ₹1–3 crore depending on plant size.
Operational Planning for Long-Term Stability
To ensure sustainable compliance:
Install digital material tracking systems
Maintain monthly steel recovery audit
Conduct quarterly environmental compliance review
Maintain EPR transaction records
Align financial year planning with obligation cycle
The key is integration of compliance and operations — not treating them separately.
Conclusion
Vehicle Scrapping Plant Setup in India after 01 April 2025 is a compliance-linked infrastructure project.
It requires:
Integration with ELV Rules, 2025
Registration on CPCB portal
Fulfillment of 8%, 13%, 18% steel recovery targets
Filing by 30 April and 30 June deadlines
Environmental compliance under EPA
Investing ₹20–35 crore without structured regulatory planning increases financial risk.
Early registration, accurate documentation, and technical layout compliance significantly reduce long-term operational disruptions.
📞 +91 78350 06182
📧 wecare@greenpermits.in
Book a Consultation with Green Permits