Ravi Mehta, the founder of EcoSteel Recyclers Pvt. Ltd., had spent decades watching old trucks rust away in his family’s transport yard on the outskirts of Pune.
When the government rolled out the Vehicle Scrappage Policy in 2021, he realized that what used to be “junk” could become a regulated and profitable business — if only he could understand how to design a compliant scrapping plant.
Like many entrepreneurs, Ravi soon discovered that success was not just about getting a license. It was about creating a scientifically designed plant, choosing the right machinery, and aligning every operation with India’s environmental and safety norms.
This article breaks down exactly what a modern scrapping facility looks like, what it needs, and how compliance translates into profitability.
An Authorized Vehicle Scrapping Facility (RVSF) is the only type of yard legally allowed to dismantle and recycle end-of-life vehicles (ELVs) in India.
It operates under the Motor Vehicles (Registration and Functions of Vehicle Scrapping Facility) Rules, 2021, and must register through the state transport department or MoRTH portal.
An RVSF’s job is not simply to crush cars — it must:
In short, an RVSF is a controlled industrial unit that treats every vehicle as a resource — not waste.
A good plant layout ensures that vehicles move smoothly through the entire process without crossing paths or contaminating clean zones.
Below is a typical sequence of operations for a facility handling around 25 vehicles per day (approximately one acre of land).
| Process Zone | Key Activities | Core Equipment | Suggested Area |
|---|---|---|---|
| 1. Vehicle Reception & Verification | Vehicle check-in, registration via VAHAN, weight recording, tagging | Weighbridge, RFID scanner, admin office | ~200 m² |
| 2. Depollution Bay | Drain fuel, oil, coolant, brake and AC fluids, remove battery | Hydraulic lifts, multi-fluid extraction rigs, spill-proof floor | ~250 m² |
| 3. Dismantling Zone | Detach tyres, glass, plastics, catalytic converters, airbags | Pneumatic tools, hoists, cutting sets, workbenches | ~300 m² |
| 4. Segregation & Storage | Separate ferrous, non-ferrous, plastics, electronics, hazardous items | Color-coded bins, pallet racks, ventilated containers | ~250 m² |
| 5. Metal Processing Bay | Shred or compress body shells for shipment to recyclers | Baler press (200 T), shear (600 T), shredder (1 MT/hr) | ~400 m² + open yard |
| 6. Hazardous Waste Room | Temporary storage of fluids, batteries, and filters | Double-lined drums, bunded floor, exhaust fans | ~100 m² |
| 7. Dispatch & Documentation | Final weighing, CoD generation, scrap dispatch | Computer terminal linked to MoRTH portal | ~150 m² |
The goal is simple: linear movement from reception to dispatch without any backward flow of vehicles or waste.
Choosing the right machinery depends on throughput and desired automation.
Below are indicative configurations used by Indian RVSFs today.
| Capacity Tier | Typical Throughput | Key Machinery | Power Load | CapEx Range |
|---|---|---|---|---|
| Small Facility | 10 vehicles / day | Manual lift tables, single depollution rig, baler (100 T), basic shear (300 T), air compressor, safety gear | 60–80 kW | ₹6–8 crore |
| Medium Facility | 30 vehicles / day | 2-post lifts × 4, automatic fluid extractor, crane, baler (200 T), rotary shear (600 T), shredder (1 MT/hr) | 120–150 kW | ₹10–15 crore |
| Large Facility | 60 vehicles / day | Integrated depollution line, guillotine shear (1000 T), multi-chamber shredder, ETP, forklifts, automated conveyor | 200–250 kW | ₹18–25 crore |
Indian manufacturers such as Advance Hydrautech, Super Recycling Solutions, and Global Green Tech Systems have developed turnkey equipment packages tailored for RVSFs.
Most facilities prefer modular machinery so they can expand capacity without changing the entire layout.
Every RVSF must align three regulatory pillars:
| Regulation | Authority | Key Focus | Why It Matters |
|---|---|---|---|
| Motor Vehicles (RVSF) Rules 2021 | MoRTH | Registration, ISO deadlines, security deposit | Legal foundation for facility approval |
| AIS-129 Guidelines | MoRTH / ARAI | Safety standards, employee welfare, record keeping | Used by inspectors to rate operational safety |
| CPCB ELV Guidelines 2023 | CPCB | Environmental safeguards, waste routing, EPR linkage | Basis for pollution-control compliance |
An audit-ready plant keeps updated logs of every vehicle processed, waste transferred, and certificate issued.
Integrating this data digitally with the MoRTH portal ensures faster renewals and transparency with regulators.
A compliant scrapping plant is both an environmental and a financial model.
Major revenue streams include:
Operating costs mostly include manpower, energy, rent, and waste-handling fees.
With efficient layout and modern balers, many medium-sized RVSFs recover their investment within four to five years.
| Issue | Possible Outcome | Prevention |
|---|---|---|
| Running operations before RVSF approval | Suspension of license | Apply early and track MoRTH status online |
| Poor containment of fluids | Environmental Compensation penalties | Use bunded floors and certified storage tanks |
| Using unregistered recyclers for hazardous waste | Rejection of annual return | Partner only with CPCB-listed recyclers |
| Delayed ISO certification | Renewal delays or cancellation | Begin ISO audit parallel to construction |
| Improper record-keeping | Legal notices under MV Act | Automate daily logs and CoD generation |
Consistency and documentation are your best insurance against regulatory action.
A useful reference is the MSTI (Maruti Suzuki Toyotsu India) facility in Noida.
Commissioned in 2021, it can handle about 2,000 vehicles per month and recovers nearly 95 % of each vehicle’s material.
Its design follows a clear one-way flow, with covered depollution bays, online CoD issuance, and in-house shredding.
This model demonstrates that strong compliance and efficiency can go hand in hand.
Building the facility right the first time prevents redesigns and downtime later.
During planning:
A modern scrapping plant is more than a scrapyard — it’s a controlled industrial process that supports India’s circular economy.
By combining smart layout design, the right machinery, and strict adherence to the Vehicle Scrappage Policy, entrepreneurs like Ravi Mehta are turning environmental responsibility into profitable business.
📞 +91 78350 06182 | 📧 wecare@greenpermits.in
Book a Consultation with Green Permits
Authorization under MoRTH’s RVSF Rules 2021, consents under Air/Water Acts, and ISO 9001/14001/45001 certifications.
Around one acre can accommodate up to 25 vehicles per day, with separate bays for each process.
Depollution rigs, hydraulic lifts, baler press, shear, shredder, and material-handling equipment like forklifts or cranes.
State transport departments generally process applications within 60 days, provided all documents are complete.
A security deposit of ₹10 lakh, registration fees, ISO certification expenses, and annual audits.